site progress

challengesite1thumbnail.jpg

Image of site works in progress, the floor deck is seen here casted with metal frames rising up to form the shell to support the roof structure.

www.zlgdesign.com

1 Response to “site progress”


  1. 1 challengepark March 11, 2007 at 3:53 pm

    our records of the work on site are carefully being archived and will soon be posted on this blog..thank you for your patience
    Huatlim


Leave a Reply




concept

We wanted a building that would age naturaly with the weather, given the abundant trees and the naturally undulating ground terrain, the specified architectural finishes should work well without much maintenance over the years, and the informal arrangement of columns, roofs and walkways should likewise help the building sit comfortably into the site.

www.zlgdesign.com

top posts

  • None

blog stats

  • 3,523 unique visitors